
The subframes final position is dependant on some body bolts... so I need to get the body back on the subframe and position it to fit two bolts through the body to the front beam.
With the body in position, I can then mark the hole positions for the subframe to floorpan, and door hinges. Oh joy! I can then drill and tap the door pilars.

I needed to cut the footwell out of the fibreglass chesil body, as the footwell's built into the new subframe. I much prefer this design as it adds a little weight and protection to the otherwise very light frontend.

No comments:
Post a Comment