Friday, 31 October 2008

More drilling and tapping to come...

The subframe looks superb, a big thanks to http://www.wjbwelding.co.uk/ for getting it to fit.


The subframes final position is dependant on some body bolts... so I need to get the body back on the subframe and position it to fit two bolts through the body to the front beam.

With the body in position, I can then mark the hole positions for the subframe to floorpan, and door hinges. Oh joy! I can then drill and tap the door pilars.

I needed to cut the footwell out of the fibreglass chesil body, as the footwell's built into the new subframe. I much prefer this design as it adds a little weight and protection to the otherwise very light frontend.


No comments: